Working Method

A structured 6-stage methodology for every traffic engineering project.

Systematic Approach, Predictable Results

Traffic Plan follows the same rigorous methodology for every project, regardless of size or complexity. Each stage has clear objectives, defined deliverables and quality checkpoints.

This structured approach guarantees that no technical decision is made without sufficient data, no solution is proposed without being tested through simulation, and every client knows exactly which stage their project is at.

Kickoff

Analysis and Problem Understanding

Each project begins with an in-depth analysis of the existing situation and the client's objectives. We familiarize ourselves with the local context, identify technical constraints and jointly define the scope, deliverables and project timeline.

  • Kickoff meeting with the client and stakeholders
  • Analysis of existing documents and studies
  • Recognition of the terrain and existing infrastructure
  • Definition of the study area and analysis scenarios
Field

Field Data Collection

Real traffic data is the foundation of any quality study. We use our automated equipment for precise data collection directly from the field, supplemented by surveys and manual observations.

  • Establishing measurement points and periods
  • Equipment installation: RTMS Echo, Viacount, DeepBlue, MioVision
  • Manual counts for intersection movements
  • Mobility surveys and O/D surveys if needed
Data

Data Processing and Validation

Raw data collected from the field is processed, validated and transformed into relevant indicators for analysis. This stage ensures that models and solutions are grounded in correct and representative data.

  • Cleaning and validating datasets
  • Calculation of indicators: flows, speeds, occupancy rates
  • Building and calibrating traffic models
  • Verificare și control calitate al rezultatelor
Modeling

Modeling and scenario analysis

Based on validated data, we build traffic models with specialized software. The models allow analysis of the existing situation, forecasting of future demand and testing of alternative scenarios before any investment.

  • Microscopic models (AIMSUN, VISSIM) for intersections and corridors
  • Macroscopic models for extended networks
  • Short, medium and long-term forecast scenarios
  • Simulation of proposed interventions and quantification of benefits
Solutions

Development of Solutions and Documentation

Based on the analyses, we develop the optimal technical solutions and associated documentation. Solutions are technically justified, constructively and legally feasible, adapted to the client's budget and priorities.

  • Development and comparison of solution alternatives
  • Design at requested phases: Feasibility Study, DALI, PT, DTAC
  • Documentation for approvals — Police, CNAIR, municipality
  • Technical reports, drawings, justification memoranda
Delivery

Delivery, Support and Monitoring

The project does not end with the delivery of the documentation. Traffic Plan provides technical assistance during implementation and monitoring of results after commissioning, to validate that objectives are achieved.

  • Presentation of solutions to decision-makers
  • Technical assistance in approval procedures
  • Support during construction works
  • Post-implementation monitoring and adjustments if needed

Advantages of the Structured Approach

Guaranteed Quality

Each stage includes verification and quality control. We deliver results grounded in real data and validated models.

Deadlines Met

The structured methodology allows us to plan and meet agreed deadlines, regardless of project complexity.

Full Transparency

The client is informed at every stage. We communicate openly about progress, risks and technical decisions.

Validated Solutions

We test scenarios through simulation before implementation. No solution is proposed without being verified in the model.